Controllers›MDCS›MDPC›Clearance Delivery
Punta Cana Clearance Delivery Control
Standard Instrument Departures (SIDs)
| Route | SID | Easterly SID | Westerly SID |
|---|---|---|---|
| KATOK | KATOK | 2T | 3T |
| CHUMA | CHUMA | 2T | 3T |
| PIXAR | PIXAR | 2T | 3T |
| ETBOD | ETBOD | 2T | 3T |
Non-Standard Departures
If an aircraft is unable to accept a SID, coordination with the relevant approach control unit is required and the agreed departure instructions should be passed to the aircraft.
Flights to Arroyo Barril
Due to the proximity of Arroyo Barril and its position, coordination with the relevant approach control unit is required prior to issuing a clearance and the agreed departure instructions should be passed to the aircraft.